We are also thrilled with the completion of the two major civil works packages, that constitute over 90% of the Demonstration Plant's civil requirements. A fantastic effort by our dedicated local supplier, Stirloch who brought us to this point.
Construction work continues to progress on site as structural steel for the spray roaster is erected. Mincore site team are working diligently to ensure the safety and efficiency of all components of the Demonstration Plant is installed.
Magnesium News
The US Department of Energy (DoE) recently released its new critical metals assessments. These graphs highlight the supply risk of magnesium as a critical metal and its importance in energy as the world seeks to decarbonise and shift towards green energy.
Latrobe Magnesium aims to ensure the supply of Magnesium, a critical metal, for the short, medium and long term with its projects both in Australia and Malaysia.
Exciting developments are happening daily in our projects and the magnesium industry. Join our thriving growing community of magnesium enthusiasts and stay up-to-date with all the latest news from Latrobe Magnesium. Subscribe now to receive our blog and ASX announcements directly to your inbox and share this blog!We are in construction mode as the majority of our equipment packages have arrived on site over the last few months for our Stage 1 Demonstration Plant. Some of the equipment that has arrived on site as Mincore engineers close-out vendor packages and the site team unload and place equipment position onsite include: